Comments on the pilot units of the national green

2022-09-22
  • Detail

Notice of the three departments on carrying out the evaluation of pilot units of the national green data center

notice of the general office of the Ministry of industry and information technology on carrying out the evaluation of pilot units of the national green data center

notice of the comprehensive Department of the National Energy Administration

joint section letter of the Department of industry and information technology [2017] No. 384

relevant regional competent departments of industry and information technology, administrative departments of government affairs Energy management department:

in order to summarize and promote the pilot experience and practices of green data centers, according to the requirements of the national green data center pilot work plan (MIIT Lianjie [2015] No. 82), the Ministry of industry and information technology, the State Administration of agency affairs and the national energy administration will jointly carry out the evaluation of pilot units of green data centers. The relevant matters are hereby notified as follows:

I. The evaluation content

evaluates the work of the pilot units of the national green data center, mainly evaluating the work of the pilot units in the promotion and use of advanced and applicable technologies, the construction of operation and maintenance management system, energy efficiency improvement, the use of water resources, the control of hazardous substances, the treatment of waste electrical and electronic products, renewable energy and clean energy applications

II. Evaluation basis

(I) pilot work plan of national green data center (the commercialization development process of vanadium battery will delay the Ministry of industry and information technology Lianjie [2015] No. 82)

(II) national green data center pilot evaluation index system (2017) (see Annex 1)

(III) national green data center pilot monitoring manual (gxtj [2016] No. 99)

(IV) data center resource utilization Part 3: requirements and measurement methods of electric energy efficiency (gb/t 32910.)

III. work arrangement

(I) self inspection of pilot units: many products are defective at this time, even just beyond the warranty period, or due to low value or service, it is difficult to find pilot units to conduct self inspection in accordance with the requirements of the national green data center pilot evaluation index system (2017), and prepare the national green data center pilot creation work summary (see Annex 2 for the format), together with the energy conservation and environmental protection monitoring data, before July 25, If it is submitted to the provincial competent department of industry and information technology, it will be deemed to have voluntarily given up the pilot qualification

(II) preliminary evaluation: the provincial competent department of industry and information technology, together with relevant departments, will review and evaluate the materials submitted by the pilot units, and fill in the scoring form for the preliminary evaluation of the pilot units of the national green data center (see Annex 3). For the pilot units that pass the preliminary evaluation, the evaluation related materials together with the scoring table shall be submitted by the provincial competent department of industry and information technology to the Ministry of industry and information technology (Department of energy conservation and comprehensive utilization)

(III) the transformation of the coal-fired furnace of the plastic granulator system has become an important issue to be solved. Final evaluation: the Ministry of industry and information technology, the State Administration of organ affairs, and the National Energy Administration organized experts to evaluate the creation of each pilot unit. During this period, some pilot units were selected for on-site verification, and the list of national green data centers was finally determined. The results were published after being publicized on the station of the Ministry of industry and information technology

IV. other matters

please submit the paper (in triplicate) and electronic (CD) versions of the relevant materials of the pilot units that have passed the preliminary evaluation to the Ministry of industry and information technology (Department of energy conservation and comprehensive utilization) by EMS mail or confidential exchange before August 20

contact person and:

Ministry of industry and information technology Yangzi micro/5368 (fax)

State Administration liuziliang

National Energy Administration Shaoquan

address: friction of the driven needle on the instigation device in Beijing No. 13, West Chang'an Street, Xicheng District, Dacheng city

zip code: 100804

attachment: 1 National green data center pilot evaluation index system (2017)

2 National green data center pilot creation work summary template

3 Preliminary evaluation and scoring form of pilot units in national green data

General Office of the Ministry of industry and information technology

Office of the State Administration of agency affairs

comprehensive Department of the National Energy Administration